Spikes Prospecting Equipment first build of MPCNC!

New Home Forum Mostly Printed CNC – MPCNC Your Builds – MPCNC Spikes Prospecting Equipment first build of MPCNC!

This topic contains 8 replies, has 4 voices, and was last updated by  Ryan 3 days, 14 hours ago.

Viewing 9 posts - 1 through 9 (of 9 total)
  • Author
    Posts
  • #105269

    Spike
    Participant

    I am starting my machine, so I can the top profile of my Gold Prospecting Equipment Sluices. Only need about an inch of cut depth, from top of the stock, it being 2 inches thick. Some molds are bigger, so I am building a 20 by 45 work area. Using 6 extra support legs, to stiffen it up.

    Printed Parts are in the way, making a list on the rest to get moving this next week.

    Need to hit the scrap yard local and see if I can find a table, if not just build one.

    Building the top out of a couple of sheets of Baltic Birch, using conduit.

    The journey has began. Not my first rodeo, but more computer stuff than used to dealing with, but I’ll learn!

    This is my last project, took right at 2 weeks start to where it is now, needing paint.IMG_20190623_160711-1
    New parts are Clemson Orange, fitting since I went there in 1976 for a year in engineering program.

    Wish me luck,Spike overlook my computer skills, any advise offered will be most welcome.

     

    Thanks Spike

    #105844

    Spike
    Participant

    Progress, tore out the old Thermoforming machine, replaced it with my new MPCNC build.

    Made good progress yesterday for sure.

    Box, frame and tell me where on the belt this part goes.

    IMG_20190711_003328

    Torsion box

    IMG_20190710_171726

    Frame rough in, waiting on my bearing and last lock nuts

    IMG_20190711_003328
    Where on the belt does this go??

     

    #105851

    Yann Vautrin
    Participant

    Those small orange things goes on the X and Y origin of the belt if you go for dual endstop config!

    1 user thanked author for this post.
    #105868

    Spike
    Participant

    I figured out for the belt, just not where, thanks!

    #105895

    Barry
    Participant

    It sets your 0 point on the belt.  So, if your standing at the “front” of the machine, X is left to right, Y is front to back.  0 is normally the front left corner.  So those go on the X and Y 0 points.  Basically give the Z assembly a quarter inch from the corners.

    1 user thanked author for this post.
    #106311

    Spike
    Participant
    #106373

    Barry
    Participant

    You need some span supports on the long side.  https://www.thingiverse.com/thing:1160962 I used the allthread feet in this one. Thread went up into the tube through a hole, then I ran a nylock up to the bottom of the tube, just enough to hold it in place so it didn’t sag.

     

    1 user thanked author for this post.
    #106459

    Spike
    Participant

    I will be adding 6 of those supports.

    Need someone to print them and a couple of motor brackets and a pen holder.

    Anyone want to make them for me?

    Can pay, or trade some mining equipment for them.

    Thanks Spike

    #106481

    Ryan
    Keymaster

    I will be adding 6 of those supports.

    You will never need more than 1 set per side. 1 set = 4x rigidity, anything above that the center tubes are a bigger factor.